HBK Steel Space Frame Systems -- Made In China, Trusted Worldwide
Steel Structure Space Frame
Glass Atrium Skylight Dome
Long-span, BV-certified space frame domes engineered for shopping malls, exhibition centers, airports, hangars and civic landmarks. Full EPC service from design to commissioning -- anywhere in the world.
30m+
Long-Span Capability
50+
Countries Exported
BV
Certified Design & Build
150+
Factory & Field Engineers
One Design Error Or Delayed Delivery Can Sink An Entire Project Timeline
Overseas contractors and owners repeatedly face the same nightmare: substandard materials disguised as premium goods, welding defects that surface after installation, factories that miss shipping windows, and site teams unable to control construction safety and schedule. For a long-span glass atrium dome -- where structural failure is not an option -- these risks are unacceptable.
HBK was built to remove that risk entirely, with in-house design, fabrication, logistics, and installation supervision under one BV-certified roof.
-
!Production delays that push back opening dates
-
!Poor site management causing schedule overruns
-
!Substandard steel and glass passed off as quality goods
-
!Installation safety incidents damaging reputation and budget
Ready to protect your project timeline and budget?
Send InquiryEngineered For Light, Span & Strength
HBK's Steel Structure Space Frame Glass Atrium Skylight Dome combines a triangulated bolt-ball or welded-node space frame with tempered/laminated glazing to deliver clear-span structures exceeding 30 meters -- without interior columns blocking usable floor area.
Long-Span Structural Frame
High-strength steel space frame with bolt-ball or welded connections, engineered per Eurocode/GB/local seismic and wind load standards.
High-Performance Glazing
Tempered, laminated, or insulated Low-E glass panels for daylighting, thermal control, and structural safety in overhead applications.
Weatherproof Envelope
Multi-stage sealing, drainage channels, and anti-corrosion coatings for durability in tropical, coastal, and desert climates.
Fully Customizable Skylight Dome Options
Every HBK dome is engineered from scratch for the specific client, building and site -- we offer no fixed catalog sizes. Choose or combine the following to match your architectural intent and budget:
Span & Geometry
Spherical, ellipsoidal, pyramidal or ridge-and-furrow domes, spans from 10m to over 100m clear span.
Glazing Type
Tempered, laminated, insulated Low-E, tinted, or self-cleaning glass; skylight strip or full transparent envelope.
Frame Finish
Hot-dip galvanized, powder-coated, or fluorocarbon painted steel in any RAL color to match your facade.
Load Rating
Site-specific wind, snow, and seismic load design for the Middle East, Africa, Southeast Asia, and beyond.
Ventilation & Smoke Control
Integrated motorized vents, smoke extraction louvers, and natural ventilation panels available on request.
Branding & Lighting
Integrated LED lighting tracks, signage mounts, and branded finishes for malls, airports, and civic buildings.
Where Our Skylight Domes Perform
Shopping Mall Atriums
Airports & Hangars
Exhibition Centers
Churches & Auditoriums
Our Production & Installation Workflow
One accountable team manages every stage in-house, eliminating handoff errors between designer, factory, and installer.
-
01
Design & Engineering
Free structural and architectural design proposal, load calculation, and BIM modeling based on your site data.
-
02
Material Procurement
Certified mill-sourced steel and glass with full traceability and material test certificates.
-
03
CNC Fabrication
Precision cutting, node forming, and welding on CNC-controlled production lines in our Xuzhou factory.
-
04
Surface Treatment
Hot-dip galvanizing and/or powder coating for corrosion resistance in coastal and tropical climates.
-
05
Trial Assembly
Factory trial assembly to verify fit, tolerance, and glazing alignment before packing.
-
06
Packing & Shipping
Export-grade packing, container/breakbulk logistics coordination, and full shipment documentation.
-
07
Site Installation
Supervised or turnkey erection by trained crews, with strict safety protocols and schedule tracking.
-
08
Commissioning
Final inspection, load testing, watertightness check, and handover documentation.
Want the full workflow timeline for your project?
Send InquiryQuality Control Checkpoints
Structural failure of an overhead glass dome is not a risk we accept. Every project passes through seven mandatory inspection gates before shipment.
Incoming raw material inspection with mill certificates for steel and glass batches
Welding and bolt-ball node inspection using ultrasonic and visual testing
Dimensional tolerance verification against approved shop drawings
Galvanizing/coating thickness and adhesion testing
Glass panel strength, sealing, and watertightness verification
Structural trial assembly and load simulation before packing
Pre-shipment inspection with optional third-party BV witness report
Design, Production & Installation Certified By Bureau Veritas (BV)
Recent Skylight Dome Projects
Nigeria -- 42m Span
Shopping Mall Atrium Roof
Delivered and installed on schedule for a general contractor, including full glazing and ventilation louver package.
Philippines -- 60m Span
Convention Center Skylight
Typhoon-rated wind load design with corrosion-resistant coating for coastal exposure.
UAE -- 85m Span
Airport Terminal Dome
High-heat desert climate performance with insulated Low-E glazing and full EPC delivery.
One Partner. Zero Handoff Risk. Full Accountability.
Safety-First Culture
Documented lift plans, trained rigging crews, and daily site safety briefings on every installation.
In-House Design Team
Structural engineers fluent in Eurocode, ASCE, and GB standards for global project approval.
Transparent Communication
Dedicated project manager, weekly progress reports, and email confirmation on every key decision.
Competitive EPC Pricing
Cost-effective solutions across low-, mid-, and high-end project budgets without compromising quality.
"HBK's team caught a design conflict before fabrication even started, and kept us updated by WhatsApp and email throughout shipping and installation. Our mall opened on schedule."
Frequently Asked Questions
What information do you need to prepare a design proposal? +
Site drawings or dimensions, intended span/height, local wind/snow/seismic data, and your desired glazing and finish preferences. We also accept a rough sketch or reference photo to start.
Can you handle installation supervision if we use local labor? +
Yes. We offer both turnkey installation crews and technical supervision packages for clients using local labor, including method statements and on-site training.
What is your typical lead time from deposit to shipment? +
Lead time depends on span and complexity, typically ranging from 30-75 days after design approval. We confirm a firm schedule in writing before production starts.
Do you provide third-party quality certification? +
Yes, our design, production, and installation processes are certified by Bureau Veritas (BV), and we can arrange BV witness inspection before shipment upon request.
Send Your Inquiry to HBK
Tell us about your steel space frame skylight dome project. Our engineering team will respond with a free design proposal and quotation.